project

ETIHAD TOWER - G+ 4P+ 14 TYPICAL + RF

– Building Consist of 4 Show Room in ground Floor, 4 Floors Parking + 14 floor’s Each Floor has 24 Flats in Ajman – U.A.E

Total Built up area: 57,500.00 sq.m

Total MEP cost: AED 28.7 million

SCOPE OF WORK: – Electro-mechanical design services to suit the Value Engineering + Site Supervision

ETIHAD-TOWER

EXPANSION OF BABEL CENTER - IRAQ

EXPANSION-OF-BABEL-CENTER---IRAQ

University of Babylon

This project consists of:

– 2 Floors, 8 Exihibition Halls

– Multi-purpose Hall

 

Total plot area: 1,500.00 sq.m.

Total Built-up Area : 3,000.00 sq.m.

Total Construction Cost: 3,000,000.00 USD

SCOPE OF WORK: Architectural, structural, MEP services for 8 Exhibition

AL-ZAFRANIYAH-PROJECT--IRAQ

AL ZAFRANIYAH PROJECT- IRAQ

– G+2 Mall.

– 15 Residential Buildings G+4 , type 1&2

– 2 Types of Villas.

– Green areas

– Roads & walkways

– Park

– Elementary School

– Infra-Structure

Total plot area: 311,460.00 sq.m.

Total Built up area: 193,000.00 sq.m.

Total Construction Cost: 120,000,000 USD

SCOPE OF WORK: – Architectural, structural , MEP & BOQ

SCIENTIFIC LABORATORIES BABEL UNIVERSITY

University of Babylon

– G+2, 16 different types of educational scientific laboratories and offices.

Total plot area: 3,200.00 sq.m.

Total Built up area: 5070.00 sq.m.

Total Construction Cost: 15,200,000 USD

SCOPE OF WORK: – Tender Drawings & BOQ (Arabic & English)

Laboratory
AL-MAHMOODYA-RESIDENTIAL-COMPLEX

AL MAHMOODYA RESIDENTIAL COMPLEX

– 40 Buildings G+4 (Two Types), 800 Residential Units.

– Mosque

– Markert

– Medical Center

– Elementary School

– Domestic Council

– Roads, walkway & Landscape

– Infra- Structure

Total Built up area: 115,500.00 sq.m

Total MEP cost: 58,000,000.00 USD

SCOPE OF WORK: – Architectural, Structural, MEP, Infra-structure &BOQ

MOSQUE (JAMA) AL KARAMA, DUBAI

Islamic affairs &Charitable activities Department

Total Built-up Area : 2,000.00 sq.m.

Total Construction Cost: AED 17 Million

SCOPE OF WORK: Electro Mechanical Design and Shop drawings preparation.

Mosque
EXECUTIVE-HEIGHTS-TOWER

EXECUTIVE HEIGHTS TOWER

OFFICE NO. 1601

Interior HVAC Design

Total Built-up Area : 200.00 sq.m.

Total Construction Cost: AED 100 Million

SCOPE OF WORK: HVAC Design and Cost Estimation for Fit out work

Kerbala Schools- IRAQ

School

– Elementary, Intermediate & Secondary Schools for boys & Girls.

– Common Facilities, Mosque, cafeteria

– Multi-purpose Hall for 600 Persons

– Playgrounds

– Services

 

Total plot area: 35,200.00 sq.m.

Total Built up area: 75,000.00 sq.m.

Total Construction Cost: 44,000,000 USD

 

SCOPE OF WORK:– Detail design of Architectural, structural , MEP & BOQ

AL-QURM-RESTAURANT---AJMAN

AL QURM RESTAURANT - AJMAN

– G+ 1+ Roof

Total plot area: 440.00 sq.m.

Total Built-up Area : 500.00 sq.m.

Total Construction Cost: AED 2 Million

SCOPE OF WORK: Entire Electro-mechanical services + Site Supervision

MUSHARIF TOWER - AJMAN

– G+ 10 typical Residential floors

Total plot area: 800.00 sq.m.

Total Built-up Area : 16,000.00 sq.m.

Total Construction Cost: AED 35 Million

SCOPE OF WORK: Electro-mechanical services to suit the Value Engineering + Site Supervision

MUSHARIF-TOWER----AJMAN
MUDON-PHASE-II-FREE-STANDING-404--VILLAS

MUDON PHASE II FREE STANDING 404 VILLAS

AT AL RUWAYAH DUBAI.

– Dubai Properties / Arif&Bintoak

– Electro-mechanical services to suit the Value Engineering.

The drawings were prepared good for construction as shop drawings facilitating the ongoing construction.

CROWN PLAZA AND STAYBRIDGE SUITES YAS ISLAND-ABU DHABI

CROWN PLAZA AND STAYBRIDGE SUITES YAS ISLAND-ABU DHABI

(RENOVATION DESIGN FOR KITCHEN)

Had been appointed to conduct design review and modify Electrical, HVAC and public healthcare design to the suit the recommendation. The complete HVAC design was recalculated and changed over the existing Electrical / HVAC design that was deemed inappropriate. The drawings were prepared good for construction as shop drawings facilitating the ongoing construction

cROWN